Where can you build Building identification signs in NSW?

“Building identification signs” is a defined term in the NSW planning system, and every council’s Local Environmental Plan decides which zones allow it. Across 147 council LEPs it is permitted in 31 zones and prohibited in 31.

Zone by zone, across 147 NSW councils

Each row counts councils, not properties. “Without consent” means no application is needed; “with consent” means a development application. “Can’t say” is not a ban — those councils have not addressed this use in that zone at all.

ZoneWithout consentWith consentProhibitedCan’t sayCouncils with this zone
E4 General Industrial159712—124
E1 Local Centre1595101121
R5 Large Lot Residential68812—106
E3 Productivity Support97511—95
R1 General Residential38014—97
RU1 Primary Production116729—107
RU5 Village77122—100
MU1 Mixed Use86712—87
RE1 Public Recreation56861—134
R2 Low Density Residential45726—87
E2 Commercial Centre6527—65
R3 Medium Density Residential15518—74
C3 Environmental Management15133—85
RE2 Private Recreation44675—125
RU4 Primary Production Small Lots13716—54
C4 Environmental Living23524—61
RU2 Rural Landscape43114—49
W2 Recreational Waterways—2930—59
C2 Environmental Conservation12367—91
E5 Heavy Industrial4193—26
SP3 Tourist22127—50
W1 Natural Waterways—2340—63
R4 High Density Residential1209—30
W4 Working Waterfront3119—23
SP4 Enterprise—131—14
RU6 Transition194—14
SP1 Special Activities2373—78
SP2 Infrastructure141291135
W3 Working Waterways—37—10
RU3 Forestry1—80—81
SP5 Metropolitan Centre—1——1
C1 National Parks and Nature Reserves——123—123

How those answers were reached. 998 of the “prohibited” answers and 544 of the “with consent” answers come from the zone’s catch-all row — the scheme does not name this use in that zone, but it says what happens to everything it has not named. That is a real answer, not a guess, and it is the reason a count of explicit listings would tell you the opposite in some zones.

What this page cannot tell you

Which zone your land is in, and whether your project is characterised as a building identification signs in the first place. The first is a question about an address; the second is a planning judgement. Check an address for the zone and the overlays on it.

Frequently asked questions

Are building identification signs allowed in every council in New South Wales?

No. Each council’s Local Environmental Plan has its own land use table, and they differ. This page counts, zone by zone, how many of the 147 NSW council LEPs permit it, prohibit it, or say nothing either way.

My zone shows a number under “Can’t say” — what does that mean?

It means those councils neither name this use in that zone nor have a catch-all row covering everything they have not named. It is not a ban and it is not permission. Only an explicit listing in the prohibited rung, or a catch-all that prohibits, is a prohibition.

Does this tell me whether my project counts as building identification signs?

No, and that is deliberate. Deciding which defined term your project is called is a planning judgement, not something this page can do for you. Search your address for the zone, then talk to a planner about how the project is characterised.

Sources

Last reviewed: the published LEPs. Rules can change — verify with your council before starting work.

General guidance only — not professional planning advice. Land use tables change as councils amend their LEPs; always confirm against the current instrument for your land.

Talk to a town planner in New South Wales

This page covers the general rules. A qualified town planner can tell you what applies to your actual block — the zone, the overlays and the approval path — before you spend money on drawings.

  • Qualified, practising town planners
  • Advice on your property, not a generic rule
  • No cost, no obligation

Free planning consultation

A qualified town planner will be in touch within 1 business day.

By submitting you agree to be contacted about your enquiry. We never sell your data. See our Privacy Policy.