Planning rules in Tasmania

In Tasmania, the Tasmanian Planning Scheme sets the zones and codes, with each council's local provisions. Whether a project needs a planning permit depends on whether it meets the scheme's acceptable solutions; building work is graded separately by risk.

356k

Lots on the zoning map

29

Councils with zoning maps

6

Projects explained, with sources

3

Routes to approval, below

How approval works in Tasmania.

The Land Use Planning and Approvals Act 1993 sets up the system. The Tasmanian Planning Scheme combines State Planning Provisions, the same everywhere, with each council's Local Provisions Schedule. It applies in every council except Kingborough, which still uses its interim scheme while its schedule is assessed. Building work is regulated under the Building Act 2016, which grades work from low-risk to permit work.

01

No permit required

Some use and development needs no planning permit where it meets the scheme's standards, such as a secondary residence of up to 60 m² on a lot where a single dwelling is allowed.

02

Permitted

Where the use is permitted in the zone and the proposal meets every acceptable solution, council must approve it, and it is not advertised.

03

Discretionary

A proposal relying on a performance criterion is advertised for 14 days. People can make representations, and those who do can appeal to the Tasmanian Civil and Administrative Tribunal (TASCAT).

Building work is graded: low-risk work needs no permit, notifiable work is notified through a building surveyor, and permit work needs a building permit. Your state’s portal: Planning in Tasmania.

Your project in Tasmania.

The statewide answer for each project, with the size limits, setbacks and approval route on its own page. Overlays on your lot can change it: check your address for those.

Questions about Tasmania.

How big can a granny flat be in Tasmania?

Currently up to 60 m². A 2026 amendment to increase the cap to 90 m² is out for consultation but not yet in force.

What size block do I need for two units in Tasmania?

In the General Residential Zone the acceptable solution is 325 m² of site area per dwelling, so about 650 m² for two. A smaller lot is not automatically ruled out - the performance criteria allow a lesser site area where infrastructure can cope and either the density suits the surrounding area or the project delivers a significant social benefit close to services.

Can I subdivide my block in Tasmania?

You can if subdivision is permitted or discretionary in your zone and each lot meets the zone's lot design standard for area, frontage, access and building area - or can be justified against the performance criteria. There is no single statewide minimum: the General Residential Zone standard is indicatively in the few-hundred-square-metre range while Low Density Residential and rural zones are much larger, and your council's Local Provisions Schedule is what applies to your land.

Do I need a permit to build a deck in Tasmania?

Not for a deck less than 1 m above the ground, which is low-risk work needing no building permit or building surveyor. A deck 1 m or more above the ground is notifiable work and must be handled by a building surveyor.

What size shed can I build without a permit in Tasmania?

Roughly 18 m² for a shed built on site, or up to 36 m² for an engineered or prefabricated kit shed — classed as 'low risk work' with no building permit. You just notify council on completion.

How high can a fence be in Tasmania without a permit?

Up to 2.1 m for a timber or Colorbond fence as low-risk building work, and 1.2 m for a free-standing masonry or concrete wall. Within 4.5 m of the street a solid fence is capped at 1.2 m, or 1.8 m if it is at least 30 per cent transparent above 1.2 m.

Where this comes from

The project answers above are summarised from each project page’s own sources. Last reviewed November 2026.

General guidance only, not professional planning advice. Planning rules change, and councils add their own controls: confirm with your council or a qualified planner before you start.

Talk to a town planner in Tasmania

This page covers the general rules. A qualified town planner can tell you what applies to your block, including the zone, overlays and approval path, before you spend money on drawings.

  • Qualified, practising town planners
  • Advice specific to your property
  • Free, with no obligation

Free planning consultation

A qualified town planner will be in touch within 1 business day.

Your details and property information go to an independent town planner we work with, who will contact you about this enquiry. See our Privacy Policy.