Planning rules in Western Australia

In Western Australia, your local government's planning scheme sets the zone and its density code, and the Residential Design Codes (R-Codes) set the standards for housing. A house that meets every deemed-to-comply standard often needs only a building permit.

1.7M

Lots on the zoning map

116

Councils with zoning maps

6

Projects explained, with sources

3

Routes to approval, below

How approval works in Western Australia.

The Planning and Development Act 2005 sets up the system. Each local government's planning scheme zones the land and gives residential areas a density code such as R20 or R40, and the R-Codes set lot sizes, setbacks and open space for each code. Subdivision is approved by the Western Australian Planning Commission. Building permits are issued under the Building Act 2011.

01

No development approval

Many single houses, ancillary dwellings and outbuildings that meet every R-Codes deemed-to-comply standard need no development approval, and go straight to a building permit, unless the site is heritage-listed or in a special control area.

02

Development approval

Where a design relies on the R-Codes design principles instead, or the scheme asks for it, the local government assesses a development application.

03

Development Assessment Panel

Projects worth $2 million or more can choose to be decided by a Development Assessment Panel instead of the local government. Single houses are decided locally.

Most building work needs a building permit from the local government's permit authority, separate from planning. Your state’s portal: WA Planning.

Your project in Western Australia.

The statewide answer for each project, with the size limits, setbacks and approval route on its own page. Overlays on your lot can change it: check your address for those.

Questions about Western Australia.

Do I need planning approval for a granny flat in WA?

Not if it meets the deemed-to-comply rules of the R-Codes - up to 70 m² and the required setbacks - in which case only a building permit is needed.

What size block do I need for a duplex in Perth?

Divide the lot area by the average site area for your R-code. At R20, where the average is 450 m² per dwelling, you generally need about 900 m²; at R30 (average 300 m²) about 600 m²; at R40 (average 220 m²) about 440 m². If your lot falls under the average needed for two dwellings it will not support a duplex unless a split code or a specific scheme provision applies.

Who approves subdivision in Western Australia?

The Western Australian Planning Commission (WAPC), not your local council. You lodge the subdivision application directly with the WAPC through the Planning Online portal; the WAPC refers it to your council and to servicing agencies for comment and then decides within 90 days. Councils in WA still assess development applications for buildings, but they cannot approve a subdivision.

Do I need approval to build a deck in WA?

A house deck 500 mm or less above natural ground usually needs no planning approval. A building permit is still required for most decks, and councils commonly require one once a deck is over 500 mm high, over 20 m², or within 900 mm of a boundary.

Do I need a permit for a shed in WA?

A prefabricated shed of 10 m² or less and up to 2.4 m high needs no building permit. Bigger sheds need a building permit, and need planning approval only if they exceed the R-Codes outbuilding limits.

How high can a fence be in WA?

There is no single statewide figure. Dividing fences are commonly 1.8 m and street fences are usually solid to 1.2 m with permeable infill above; the binding number comes from your local government's fencing local law and the R-Codes.

Where this comes from

The project answers above are summarised from each project page’s own sources. Last reviewed November 2026.

General guidance only, not professional planning advice. Planning rules change, and councils add their own controls: confirm with your council or a qualified planner before you start.

Talk to a town planner in Western Australia

This page covers the general rules. A qualified town planner can tell you what applies to your block, including the zone, overlays and approval path, before you spend money on drawings.

  • Qualified, practising town planners
  • Advice specific to your property
  • Free, with no obligation

Free planning consultation

A qualified town planner will be in touch within 1 business day.

Your details and property information go to an independent town planner we work with, who will contact you about this enquiry. See our Privacy Policy.