Dual occupancy rules in Western Australia (2026)

Depends on your lot

Driven by your R-code density - most R20 lots need about 900 m²

It comes down to your R-code. Two dwellings on one lot are grouped dwellings under the Residential Design Codes, and the density code mapped to your lot - R20, R30, R40 and so on - sets the average and minimum site area per dwelling, which is what decides whether your block can take two.

Key rules at a glance

Site area per dwellingSet by your R-code. Indicative figures: R20 average 450 m² and minimum 350 m²; R25 average 350 m² and minimum 300 m²; R30 average 300 m² and minimum 260 m²; R40 average 220 m² and minimum 180 m².
What that means for two dwellingsRoughly 900 m² at R20, 700 m² at R25, 600 m² at R30 and 440 m² at R40 (indicative - the average site area applies across the whole lot).
Density codeMapped per property by the local planning scheme. Split codes such as R20/R40 apply in some areas and can unlock a higher density where the scheme criteria are met.
Approval pathwayDevelopment approval from the local council in most cases, assessed against the R-Codes, plus WAPC approval for any subdivision or survey-strata.
Can it be subdivided or strata titled?Yes. Green title subdivision creates fully independent lots; survey-strata is used where a driveway or services are shared. Both are approved by the WAPC, generally within 90 days, then conditions must be cleared before new titles issue.
Typical timeframeCommonly 2-4 months for development approval, plus around 90 days for WAPC subdivision approval and further time to clear conditions and create titles.

Conditions & eligibility

  • Your lot's R-code must provide enough average and minimum site area for two dwellings.
  • Open space, setbacks, site cover, outdoor living areas and car parking under the R-Codes must be met.
  • Medium density provisions in Part C of the R-Codes apply to grouped dwellings at R30 and above.
  • Reticulated sewer connection is generally required; unsewered lots are usually ruled out.
  • Heritage listings, bushfire prone areas and flood-affected land add assessment and can prevent approval.
  • Subdivision or survey-strata is a separate WAPC approval, not automatic with development approval.
Overlays can change your eligibility

Heritage, flood and bushfire controls on your specific lot can remove the fast-track and require a full application, even when the general rules say you're fine.

HeritageFloodBushfire
Check your address for overlays →

How approval works in Western Australia

Grouped dwellings normally need development approval from your local council, assessed against the R-Codes and the local planning scheme. Some councils exempt a fully deemed-to-comply proposal from development approval, so check locally. Creating two titles is separate again: green title subdivision or survey-strata is approved by the Western Australian Planning Commission (WAPC), which has a 90 day statutory period. A building permit is always required.

Local planning schemes and local planning policies vary setbacks, site cover and split-code criteria, and some councils require development approval where neighbouring councils do not.

Planning rules across Western Australia: every route to approval, and the answer for other projects →

Dual occupancy rules by council in Western Australia

Local councils apply the Western Australia framework and can add their own controls. Pick your council:

Frequently asked questions

What size block do I need for a duplex in Perth?

Divide the lot area by the average site area for your R-code. At R20, where the average is 450 m² per dwelling, you generally need about 900 m²; at R30 (average 300 m²) about 600 m²; at R40 (average 220 m²) about 440 m². If your lot falls under the average needed for two dwellings it will not support a duplex unless a split code or a specific scheme provision applies.

Can a duplex in WA be sold as two separate properties?

Yes. You apply to the Western Australian Planning Commission for either a green title subdivision, which creates two fully independent lots, or a survey-strata, which is used where a common driveway or shared services are involved. The WAPC has a 90 day statutory period, after which conditions must be cleared before the new titles issue.

Do I need council approval to build two dwellings on one lot in WA?

Usually yes. Grouped dwellings normally need development approval from the local council, assessed against the R-Codes and the local scheme, although some councils exempt proposals that meet every deemed-to-comply provision. A building permit is always required, and subdivision or strata titling is a separate WAPC approval.

This is general guidance, not professional planning advice. Figures are summarised from the sources above and can change — confirm with your council or the WA Planning before starting work. Last reviewed: July 2026.

Talk to a town planner in Western Australia

This page covers the general rules. A qualified town planner can tell you what applies to your block, including the zone, overlays and approval path, before you spend money on drawings.

  • Qualified, practising town planners
  • Advice specific to your property
  • Free, with no obligation

Free planning consultation

A qualified town planner will be in touch within 1 business day.

Your details and property information go to an independent town planner we work with, who will contact you about this enquiry. See our Privacy Policy.