Planning rules in Victoria
In Victoria, your council's planning scheme sets the zone and any overlays, and decides whether a project needs a planning permit. Building work usually needs a building permit as well, from a registered building surveyor.
Lots on the zoning map
Councils with zoning maps
Projects explained, with sources
Routes to approval, below
How approval works in Victoria.
The Planning and Environment Act 1987 sets up the system. Every council's planning scheme is built from the Victoria Planning Provisions, so zones and overlays work the same way across the state, with local schedules adding detail. Houses and townhouses are assessed against the residential standards in clauses 54 and 55. Building work is regulated separately under the Building Act 1993.
No planning permit
Many projects need no planning permit where neither the zone nor an overlay asks for one: often a single house on a lot of 300 m² or more, a deck or a shed, and a small second dwelling of up to 80 m² on a lot of 300 m² or more, which stays on the same lot as the main home.
VicSmart
A 10 business day planning permit for straightforward applications that meet set standards, with no public notice. Since October 2025 it includes two homes on a lot in most residential zones, where every deemed-to-comply standard is met and no overlay such as heritage or flooding rules it out.
Planning permit
Everything else is assessed by council against the planning scheme. Applications are often advertised, neighbours can object, and decisions can be reviewed at VCAT.
Most building work also needs a building permit from a registered building surveyor, whether or not a planning permit was needed. Your state’s portal: Planning Victoria.
Your project in Victoria.
The statewide answer for each project, with the size limits, setbacks and approval route on its own page. Overlays on your lot can change it: check your address for those.
Granny flats
Fast-track availableYes. A small second dwelling of up to 80 m² on a lot of 300 m² or more needs no planning permit in most residential and rural zones unless an overlay requires one, so you only need a…
Granny flat rules in VICDual occupancy
Depends on your lotUsually yes, with a planning permit. Victoria sets no statewide minimum lot size for a second dwelling, but the mandatory minimum garden area and the Townhouse and Low-Rise Code standards…
Dual occupancy rules in VICSubdivision
Depends on your lotUsually possible in principle, but you need a planning permit and each new lot must satisfy the subdivision requirements of your zone and the schedule to that zone in your council's…
Subdivision rules in VICDecks & pergolas
Depends on your lotA low deck usually needs no building permit: a freestanding deck no more than 10 m² and no higher than 800 mm above the ground is exempt. Any deck attached to the house, or more than 800 mm…
Deck & pergola rules in VICSheds & garages
Depends on your lotA freestanding shed of 10 m² or less and up to 3 m high needs no building permit, and in a standard residential zone with no overlays no planning permit either. Anything bigger needs a…
Shed & garage rules in VICFences
Fast-track availableIn Victoria a timber or Colorbond fence needs no building permit if it is no more than 2 m on side and rear boundaries, no more than 1.5 m within 3 m of the street, and no more than 1 m…
Fence rules in VICZoning in Victoria.
The zone decides what can be built on a lot. See it for any address, on the map, or council by council.
Zoning maps by council
Every council we map in Victoria: its zones, lot sizes and the flood, bushfire and heritage overlays, from the government’s own data.
79 councilsWhat’s permitted in each zone
Whether a dual occupancy, a home business or a child care centre is allowed, from the land use tables for Victoria.
Browse land usesThe zoning map
Every lot’s zone, boundary and size on one map, with the overlays that change what you can build.
Open the mapThe largest councils, by lots mapped
Questions about Victoria.
Do I need a planning permit for a granny flat in Victoria?
Usually no. A small second dwelling of up to 80 m² on a lot of 300 m² or more needs no planning permit unless an overlay requires one, but a building permit is still required. In a Heritage Overlay it needs no permit if it is no more than 5 m high and finished in muted tones.
What is the minimum land size for a dual occupancy in Victoria?
There is no statewide minimum. What binds is the garden area requirement - 25 to 35 percent on lots of 400 m² or more in the General Residential and Neighbourhood Residential zones - plus setbacks, private open space and car parking under the Townhouse and Low-Rise Code. In practice most dual occupancies are built on lots of about 500 m² and up, although well-designed schemes do succeed on smaller lots in the General Residential and Residential Growth zones.
Can I subdivide my block in Victoria?
Only if subdivision is allowed in your zone and each new lot works for access, servicing and setbacks around anything already built. There is no statewide minimum lot size in Victoria: a minimum applies only where a Neighbourhood Residential or Low Density Residential Zone schedule specifies one (often 800 m² or more), while General Residential and Residential Growth zones have no minimum subdivision area at all. Check the schedule that applies to your property.
Do I need a building permit for a deck in Victoria?
Not for a freestanding deck that is 10 m² or less and no higher than 800 mm above the ground. Any deck attached to the house, or more than 800 mm high, needs a building permit from a registered building surveyor.
What size shed can I build without a permit in Victoria?
A freestanding shed of 10 m² or less and no more than 3 m high generally needs no building permit. Above 10 m² (or of heavier construction) you need a building permit, even if you don't need a planning permit.
How high can a fence be in Victoria without a permit?
Generally 2 m on side and rear boundaries and 1.5 m within 3 m of the street, dropping to 1 m within 9 m of a corner intersection. Brick or masonry over 1.2 m needs a building permit.
Where this comes from
- Planning permits - Planning Victoria
- VicSmart permits - Planning Victoria
- Simplifying subdivisions (Amendment VC288) - Victorian Government
The project answers above are summarised from each project page’s own sources. Last reviewed November 2026.
General guidance only, not professional planning advice. Planning rules change, and councils add their own controls: confirm with your council or a qualified planner before you start.
Talk to a town planner in Victoria
This page covers the general rules. A qualified town planner can tell you what applies to your block, including the zone, overlays and approval path, before you spend money on drawings.
- Qualified, practising town planners
- Advice specific to your property
- Free, with no obligation