Monash zoning map
Every one of the 91,538 parcels in Monash, Victoria — mapped by zone, lot size, and bushfire, flood and heritage constraints. Free, no sign-up, built from Victoria government spatial data.
Open Monash on the map
Pan the parcel map, filter by zone family and minimum lot size, and click any lot for its zone, measured area and mapped constraints.
Or jump straight to: residential land · granny-flat sized lots (450 m²+) · subdivision sized lots (800 m²+)
Zones in Monash
GENERAL RESIDENTIAL ZONE - SCHEDULE 3 covers the most land by parcel count — 33,910 parcels, about 37% of the council. These are the 8 most common zones across all 91,538 parcels.
| Zone | Parcels | Share |
|---|---|---|
| GENERAL RESIDENTIAL ZONE - SCHEDULE 3 | 33,910 | 37.0% |
| NEIGHBOURHOOD RESIDENTIAL ZONE - SCHEDULE 4 | 13,669 | 14.9% |
| GENERAL RESIDENTIAL ZONE - SCHEDULE 2 | 7,050 | 7.7% |
| PRECINCT ZONE - SCHEDULE 1 | 5,980 | 6.5% |
| PRECINCT ZONE - SCHEDULE 3 | 4,943 | 5.4% |
| PRECINCT ZONE - SCHEDULE 5 | 4,067 | 4.4% |
| HOUSING CHOICE AND TRANSPORT ZONE - SCHEDULE 2 | 3,648 | 4.0% |
| NEIGHBOURHOOD RESIDENTIAL ZONE - SCHEDULE 3 | 3,451 | 3.8% |
2,327 parcels carry more than one zone. On a split lot the controls differ across the block, so a single zone label for the property can be misleading — the map shows each part and its area.
Constraints mapped in Monash
Overlays decide what you can actually build, and they are mapped per property rather than per council. These totals show how much of Monash carries each one — and, just as importantly, how much of it nobody has assessed.
Bushfire
0%
No parcel in Monash is inside a mapped bushfire overlay. The council has been mapped and none of it is affected, so bushfire planning controls do not apply here — not that the land cannot burn.
Flood
5.63%
5,156 parcels (5.63%) are inside a mapped flood overlay. The rest sit outside it, so the flood planning controls do not apply there — not that the land cannot flood.
Heritage
1.62%
1,481 parcels (1.62%) are inside a mapped heritage overlay. The rest sit outside it, so the heritage planning controls do not apply there — not that a property here could never be listed in future.
Heritage, flood and bushfire controls on your specific lot can remove the fast-track and require a full application — even when the general rules say you're fine.
Building rules in Victoria
Zoning tells you what the land is for. These guides cover what you can actually build on it under Victoria rules.
Frequently asked questions
How do I find the zoning of a specific property in Monash?
Enter the address in ZoneScout's address search. It returns the zone, the overlays mapped on that lot and the lot boundary, queried live from the Victoria planning services rather than from this page's snapshot.
What are the most common zones in Monash?
GENERAL RESIDENTIAL ZONE - SCHEDULE 3 is the largest by parcel count — 33,910 of 91,538 parcels, about 37%. The full breakdown of the 8 most common zones is in the table above.
How many properties are in Monash?
Our map holds 91,538 parcels for Monash, covering about 211 km². That is what our map holds for this council. It is drawn from the state cadastre, but some parcel types are deliberately left out — strata unit lots stacked on their base parcel, and easements — so it is not the same as a count of titles.
Is this zoning information official?
It is built from the Victoria government's own published spatial data, but it is a snapshot taken on 2026-09-06 and is not a substitute for a planning certificate. For a decision that matters, check the address live and confirm with Monash council.
About this data
- Parcel boundaries, zoning and overlays: Victoria government spatial services
- Snapshot taken: 2026-09-06 — check any address live
- 91,538 parcels across 211 km²
General information only, not planning advice. Zoning and overlay mapping is published by Victoria government agencies and Monash council and can change; confirm with the council or a qualified planner before relying on it. Snapshot: 2026-09-06.
Talk to a town planner in Monash
This page covers the general rules. A qualified town planner can tell you what applies to your actual block — the zone, the overlays and the approval path — before you spend money on drawings.
- Qualified, practising town planners
- Advice on your property, not a generic rule
- No cost, no obligation