What’s permitted in E5 Heavy Industrial

Liverpool Local Environmental Plan 2008 · as at 19 August 2026 · Liverpool City Council

This list comes from the Local Environmental Plan (LEP) that applies to this address.

The land use table

These are the planning scheme’s official terms. A close match tells you the rule for that term; whether your project counts as that term is a judgement call.

Permitted with consent 25

Development Application (DA)

  • Boat building and repair facilities
  • Building identification signs
  • Business identification signs
  • Crematoria
  • Data centres
  • Depots
  • Environmental facilities
  • Environmental protection works
  • Flood mitigation works
  • Freight transport facilities
  • General industries
  • Hazardous storage establishments
  • Heavy industrial storage establishments
  • Heavy industries
  • Horticulture
  • Industrial training facilities
  • Kiosks
  • Mortuaries
  • Offensive storage establishments
  • Oyster aquaculture
  • Recreation areas
  • Roads
  • Rural industries
  • Tank-based aquaculture
  • Warehouse or distribution centres

Anything not named below is treated as “Prohibited”. That is not the same as being on the list.

Objectives of this zone

  • To provide areas for industries that need to be separated from other land uses.
  • To ensure the efficient and viable use of land for industrial uses.
  • To minimise any adverse effect of industry on other land uses.
  • To encourage employment opportunities.
  • To preserve opportunities for a wide range of industries and similar land uses by prohibiting land uses that detract from or undermine such opportunities.

Some state-level housing and precinct policies sit above council rules and can override them. Those aren’t included here.

A council’s LEP can also grant extra permitted uses of its own on top of the standard list. Those aren’t included here either.

Check a property in Liverpool

This page is the table for the zone. Search an address to see whether this zone actually covers the lot, or open the Liverpool zoning map.

E5 across NSW

Each NSW council writes its own table for E5, and they don’t all allow the same things. See what E5 allows across every NSW council that uses it.

Frequently asked questions

Does this E5 Heavy Industrial table apply to my property in Liverpool?

Only if this zone and this planning scheme apply to the land. Search your address — that is what names both.

Can I assume my project is one of the terms listed for E5 Heavy Industrial?

No. The list uses the planning scheme’s official names. Whether your project counts as one of those names is a judgement call — that’s what a planner is for.

If a use is not listed in E5 Heavy Industrial, is it prohibited in Liverpool?

Not by itself. Unlisted uses follow this zone’s fallback (“Prohibited”). That is different from being named on the list.

Sources

Last reviewed: 19 August 2026. Rules can change, so verify with your council before starting work.

General guidance only. Not planning advice. This is the land use table from Liverpool Local Environmental Plan 2008, sourced 19 August 2026. It does not decide what your project is, and overlays can still change what you need to apply for.

Talk to a town planner in Liverpool

This page covers the general rules. A qualified town planner can tell you what applies to your block, including the zone, overlays and approval path, before you spend money on drawings.

  • Qualified, practising town planners
  • Advice specific to your property
  • Free, with no obligation

Free planning consultation

A qualified town planner will be in touch within 1 business day.

Your details and property information go to an independent town planner we work with, who will contact you about this enquiry. See our Privacy Policy.